CAPABILITIES
-
With 2 single pin on buckets - Transmission/Distribution
-
-
Vertical / Rock excavation
-
-
Vacuum Excavation Remote hose support
320 l/f capability
-
Core Barrel Rock tooling for solid rock
Rock Breakers
Rock Anchor installation
-
-
Customers
Alvah Group
Henkels & McCoy
Michels Pacific Energy
Pinnacle Power Services
Par West
Intren
MGE Underground Inc
UCS LLC
RECENT PROJECTS
UCS LLC: Kirker 2104 PM: 35112323 – Full civil underground circuit rebuild for betterment.
Full civil installation, pothole existing utilities, trench and HDD to install 4” conduit, install pre-cast concrete pads, backfill & compaction, electric clearance support and hardscape and landscape restoration aprox. 20,000 l/f of distribution underground infrastructure installation
Intren: Airways 1107 Circuit Build – Critical Deadline, Fresno Ca, PM: 74013564
Installation of new circuit from Airways substation – full civil installation to install new conduit and substructures. Pothole existing utilities, trench and installation of 3200 l/f of (2) 6” conduits, install (20) #7 IVT concrete vaults with intercepts of existing spare conduit to new vaults, backfill & compaction, electric clearance support, and hardscape and landscape restoration
Henkels & McCoy: Transmission
Eureka North Coast OH Support 2+ years, inaccessible access, vertical excavation support, rock excavation & installation for transmission pole replacements. Access routes to inaccessible structures and full restoration and rehab for environmental site restoration.
Par West:
10,000 mile Fire hardening civil underground installation: Wildwood 1101
Henkels & McCoy Distribution:
Civil Underground - Sierra/North Valley/Sacramento: All aspects of civil support, new underground infrastructure construction – New Business, existing civil support for electrical underground distribution repairs and replacement.
OH line support – Sierra/North Valley/Sacramento:
Inaccessible excavation & OH tracked line support for distribution pole replacements, inaccessible OH pole support and equipment, vertical hole excavation and anchor installations Hydro truck excavation to support distribution electrical crews pole replacement program and emergency storm response.
H&M Monument Fire Dispatch: Emergency response for Monument Fire Humboldt County:
Worked with Cal Fire to install 2+ miles of fire break for (2) transmission circuits with D6 Dozer. Hand dig multiple inaccessible pole locations for power pole restoration. Installed access routes to multiple locations w/ dozer & large excavator to replace critical structures for power line restoration. Rehabilitation, environmental restoration working with PG&E environmental teams for the SWPP and BMP best management for fire restoration